Dears,
i have an issue here .. my VC structure is
KMAT (1000551) have two variants (4000181) (4000182)
the KMAT one have super bom which contain one class .. this class replace with one of this raw materials (1000559) (1000560) (1000563) (1000562).
my problem when i create a production order for the variant material i got this error
also i created the BOM link to the KMAT and added the material to the routing
and when i run CU50 for the KMAT material i got the variant and the bom item
so what i can do to solve this BOM explosion error.
i tried to follow this steps and i didn't get any result
No BOM explosion in production order | SCN
BR,
Salah