Hi
I have checked the 8KEM and 8KEQ and OMX2 everything is fine.
Even we don't have currency 31 in 8KEM why the above error for group costing
Hi
I have checked the 8KEM and 8KEQ and OMX2 everything is fine.
Even we don't have currency 31 in 8KEM why the above error for group costing