Dear All,
I have one requirement one plant will have multiple storage locations.
I am trying to plan using all of them.
MRP AREA Created with three sloc, 4000, 1400, 1500
Parameters maintained
Mrp-1 View
MRP type-PD
LOTSIZE –WB
MIN LOTSIZE-2
MAX STOCK LEVEL-16
Safety stock-11
MRP AREA created and maintained in material master
MRP GROUP- (planning with planning material)
Mrp type- VB
Reorder-2,
Lot size-HB-REPLINISH to maximum stock level
Maximum stock level-8
Mrp-2 no values maintained.
MD02 with MRP area
PR is generated for qty 8 as in mrp area sloc 4000
We want to plan multiple sloc in one plant using MRP area. How can this be tested.
extended to sloc 1400 above same values are copied.
regards,
sanket.